当前位置:首页 > 报告详情

纽约太阳报更新.pdf

上传人: 山海 编号:627205 2025-04-21 9页 1.55MB

1、11NY-Sun UpdatesLuke Forster,Sr.Business AnalystCentral Hudson Solar SummitMarch 6,2025How much distributed solar was installed in 2024?58 84 169 283 324 330 432 479 543 771 851 885 1,240-200 400 600 800 1,000 1,200 1,4002012201320142015201620172018201920202021202220232024MW DCMWdc of PV Installed A

2、nnually 3Statewide MW Built Annually,By Project Size2024 C/I was 87%Community Solar14%Remote Crediting or Remote Net Metered1%Net Metered53 59 59 63 147 191 236 186 572 601 590 991 -200 400 600 800 1,000 1,200 1,4002021202220232024MW DCNonresidentialResidentialC/I42024 Solar Deployment by Utility(MW

3、)Overall deployment is driven by upstate Community Solar All utilities saw meaningful residential deploymentQueensStaten IslandBronxBrooklyn5Central Hudson MW Built Annually,By Project Size36 62 50 11 11 3 3 4 3 6 7 10 19 23 18 -10 20 30 40 50 60 70 8020202021202220232024MWdc C/I Nonresidential Resi

4、dential CDG deployment has contracted Residential deployment,although lower than 2023 level,was higher than earlier years6Price per Watt Over TimeBoth residential and C/I price per Watt values remain steady,due to Inflation High cost of capital(residential loans and CDG financing)Increasing intercon

5、nection and siting costs(C/I)High customer acquisition costsNYSERDA Updates Beyond 10 GW NY State is on track to achieve 10 GW of distributed solar installed by 2030 NYSERDA has posted the final MW blocks authorized by the 10 GW Order Added 32MW at$0.15/Watt to Residential block structureAdded 83MW

6、at$0.05/Watt to C/I block structure NYSERDA has proposed using a projected$346M surplus for LMI-focused solar,this is pending review by the PSC Attempting to roll out$250M for LMI residential and CDG later this year through Federal EPA Solar For All grant NYSE

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
在2024年,纽约州安装的分布式太阳能总量为1240兆瓦(MW)。其中,87%是社区太阳能项目,14%是远程信用或远程净计量项目,小于1%的是净计量项目。各规模项目的 statewide MW 建设年度如下:- 2024年:1,240 MW- 2023年:885 MW- 2022年:692 MW- 2021年:588 MW 此外,2024年各电力公司的太阳能部署情况(MW)如下:- 中央哈德逊(Central Hudson):366 MW- 纽约市(Queens, Staten Island, Bronx, Brooklyn):共计 250 MW 价格方面,住宅和商业/工业(C/I)每瓦特的价格保持稳定,主要受到通货膨胀、高资本成本(住宅贷款和C/I融资)、增加的互联和场地成本(C/I)、以及高客户获取成本的影响。 关于NYSERDA的更新,到2030年,纽约州有望实现10吉瓦(GW)的分布式太阳能安装。NYSERDA已经为10 GW订单发布了最终批准的兆瓦块,并计划使用约3.46亿美元的盈余专注于低收入家庭(LMI)的太阳能项目。此外,NYSERDA还计划通过联邦环保局(EPASolar For All)的赠款,推出2.5亿美元的LMI住宅和C/I项目。 最后, statewide solar for all(S-SFA)项目已经启动,为社区太阳能项目(及储能)提供新的解决方案。
2024年分布式太阳能安装量有多少? 2024年社区太阳能和远程信用或远程净计量占比是多少? NYSERDA在2030年前实现10GW分布式太阳能安装的目标进展如何?
客服
商务合作
小程序
服务号
折叠