1、CONFIDENTIALEnergy Storage for a Better WorldSECURING THE GRID WITHWV-MADE ENERGY STORAGE2025 West Virginia Energy Summit 2025 FORM ENERGY|CONFIDENTIAL2Overview:American innovation to transform the power grid MANAGEMENT TEAMDecades of cumulative storage experience and 100s of MWsdeployed RJ JohnsonC

2、hief Commercial OfficerMateo JaramilloChief Executive OfficerTed WileyPresident&Chief Operating OfficerWilliam WoodfordChief Technology OfficerMarco FerraraChief Digital OfficerYet-Ming ChiangChief Science Officer Founded in 2017 to create low-cost,multi-day energy storage capable of providing cost-

3、effect,firm capacity to the electric grid around the globe Multi-day iron-air batteries can store and discharge energy for 100 hours High-volume manufacturing facility in Weirton,West Virginiain production 25 GWh($800M)of contracted capacity with leading utilities and developers and first commercial

4、 deployment in 2025 to Great River Energy(GRE)Pipeline of innovation includes cost-competitive electrochemical ironmakingOVERVIEW87k ft2Bay Area,CA250 employees150k ft2Somerville,MA250 employees1,000Employees550k ft2Weirton,WV450 employees 2025 FORM ENERGY|CONFIDENTIAL3The Problem:Not enough firm ca

5、pacity to meet AI-drive power demand Data Center Demand is Driving Exponential Load Growth in the U.S.The Risk of a Potential“Power Shortfall”Is SignificantProjected total U.S.data center power demand(GW)(1)Potential shortfall in power for U.S.data centers(GW)(2)+17%2024-2030 CAGRU.S.Power Needed,20

6、25-28U.S.Data Centers Under ConstructionAvailable U.S.Grid CapacityPotential Shortfall65(6)(15)(45)By 2030,data center demand is expected to account for an incremental 800 TWh/year in the U.S.,compared to 2024 2025 FORM ENERGY|CONFIDENTIAL4A Solution:100-Hour

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
1. 公司概况:Form成立于2017年,致力于低成本多日储能,核心团队拥有数十年储能经验及数百兆瓦部署经验。 2. 技术突破:铁空气电池可储能100小时,提供24/7稳定电力,首商用电池2025年交付Great River Energy。 3. 生产规模:西弗吉尼亚州Weirton工厂投产(55万平方英尺,450名员工),已签约25GWh产能(约8亿美元)。 4. 市场需求:AI驱动数据中心需求激增,2030年美国数据中心增量需求约800TWh/年,电网面临潜在电力短缺。 5. 解决方案:100小时储能技术可提供超90%可用性,成本竞争力达20/kWh,助力电网稳定。
**铁电池优势?** **储能缺口多大?** **2025产能如何?**
客服
商务合作
小程序
服务号
折叠