1、Queued Up:Status and Drivers of Generator Interconnection BacklogsJoachim Seel,Lawrence Berkeley National LaboratorySolar and Storage Finance USAMay 2,2024This work was funded by the U.S.Department of Energy under Contract No.DE-AC02-05CH11231.The views and opinions of the authors expressed herein d

2、o not necessarily state or reflect those of the United States Government or any agency thereof,or The Regents of the University of California.Image source:Licensed from Shutterstock2Current interconnection process was designed in 2003 for an electricity system with fewer,larger,centralized power pla

3、nts(though RTOs have implemented some reforms)A project developer initiates a new interconnection request(IR)and thereby enters the queueA series of interconnection studies establish what new transmission equipment or upgrades may be needed and assigns the costs of that equipmentThe studies culminat

4、e in an interconnection agreement(IA):a contract between the ISO or utility and the generation owner that stipulates operational terms and cost responsibilitiesMost proposed projects are withdrawn,which may occur at any point in the processAfter executing an IA,many projects are built and reach comm

5、ercial operationNote:These steps are in accordance with Federal Energy Regulatory Commission(FERC)pro-forma interconnection procedures as outlined in FERC Order 2023.Some ISOs already use a cluster-study approach.The data presented in this report pre-date Order No.2023 implementation.3Annual interco

6、nnection requests have surged since 2013(both in terms of number and capacity);over 900 GW added in 2023 aloneNotes:(1)This total annual volume includes projects with a queue status of active,suspended,withdrawn,or operational.(2)All values especially for earlier years should be considered approxima

友情提示

1、下载报告失败解决办法
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站报告下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

本文(排队中:发电机并网积压的现状与驱动因素.pdf)为本站 (小小) 主动上传,三个皮匠报告文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三个皮匠报告文库(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。
客服
商务合作
小程序
服务号
折叠