RequirementsConsiderations of Next Generation ORv3 PSU and Power Shelves.pdf

编号:161254 PDF 16页 2.40MB 下载积分:VIP专享
下载报告请您先登录!

RequirementsConsiderations of Next Generation ORv3 PSU and Power Shelves.pdf

1、Requirements/Considerations of Next Generation ORv3 PSU and Power ShelvesCihan Aydin,Sen.Electrical Engineer,Delta Energy SystemsHarry Soin,Senior Director,Advanced EnergyRequirements/Considerations of Next Generation ORv3 PSU and Power ShelvesRACK&POWERPOWER AND COOLINGComparison ORV3 PSU to ORV3 H

2、igh Power Rack PSUCihan AydinDifferences ORV3 High Power Rack to ORV3 3kW PSUPulse load management modeOutline Features.Harry SoinEfficiency CurvePSU to BBU transferThermal performanceContentComparison ORV3 to ORV3 HPR PSUComparison ORV3 PSU to ORV3 HPR PSU520mm to 640mm increase by 23%3kW to 5.5kW

3、increase by 83%Power increase from 18kW to 33kW within same shelf outer dimsensionsTransition to BBUTransition method changed from a output voltage drop by 3V to a AC_LOSS signal from PSU Shelf to BBU to activate BBUsPulse load requirement with adjusted limits(max.increased from 155%to 160%)Differen

4、ces ORV3 High Power Rack to ORV3 VbustimeV_BBU_trigger 48.5V48VPSU runs for 20ms FLBBU runs up to 240sstart of ac outageBBU starts in 4msecPSU voltage drops by 3V after its holdup energy is lost by 50%BBU startsNote1:all numbers with+/-0.25%accuracy.Note2:PSU and BBU voltage droop is 0.5V for 0-100%

5、load.Note3:BBU is triggered after Vbus is 48.5V for 2ms and starts up within 2ms(4ms total).Note4:if BBU current 48.5V for 200ms,BBU goes to the stand by mode.Note5:PSU hold-up energy is 60J for loads up to 150%.Note6:PSU 3V drop should occur after its hold-up energy is lost by 50%.This can be done

6、by setting a proper trigger value on the PSU PFC bulk voltage.Note7:PSU 3V drop fall time is 1ms(3V/ms.)PSU turns on after ac backBBU turns offBBU turns off after 200msec48V47.5V47.5VThe PSU shall have the function of pulse load management,especially for GPU-based load possibly with repetitive peak

友情提示

1、下载报告失败解决办法
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站报告下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

本文(RequirementsConsiderations of Next Generation ORv3 PSU and Power Shelves.pdf)为本站 (张5G) 主动上传,三个皮匠报告文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三个皮匠报告文库(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。
客服
商务合作
小程序
服务号
折叠