当前位置:首页 > 报告详情

ZRA 演示.pdf

上传人: 颜** 编号:1245912 2026-05-23 24页 4.97MB

1、Water!Today,Tomorrow1UNLOCKING THE ZAMBEZIHydropower Development along the Zambezi River Cascade.Zimbabwe-Zambia Energy Projects Summit.Livingstone|27 November 2025.Presentation Outline1.Overview of the Zambezi River Authority2.Demand and Hydro Power Potential on the Zambezi River Common to the two

2、States3.Batoka Gorge Hydro Electric Scheme(BGHES)Project Overview4.Devils Gorge Hydro Electric Scheme(DGHES)Project Overview5.Lake Kariba Floating Solar Photovoltaic(FSPV)Project Overview 6.The Investment Ask2 2Water!Today,TomorrowWater!Today,TomorrowBi-national organization established on 1 October

3、1987bythegovernmentsofZambiaandZimbabwe.Mandate:Operation and maintenance of the KaribaDam,and development of new hydropower projectson the shared section of the Zambezi River.Core functions:River basin management and Dam safety.Power Infrastructure development.Environmentalstewardshipandregionalcoo

4、peration.3Overview of ZRAWater!Today,Tomorrow4 1904-1972 Geological investigations for hydropowerscheme sites downstream of Victoria Falls.Over 6,730MW of Hydropower energy productionsites.Only 2,130MW so far has been developed,and4,600 remain untapped.Additional upstream reservoirs are a climate-re

5、silient strategy for the two Countries/Region Conjunctive operation.Integration of other renewable energy sources,such as floating solar and green Hydrogen.The AGREED position is to start with the Development of the Batoka Gorge Hydro-Electric Scheme,followed by Devils Gorge HES then Mupata Gorge HE

6、S.The Zambezi River Cascade Vision Forecast for peak demand,energy sales and energy sent out forZimbabwe(2018-2045)Water!Today,TomorrowPeak Demand for Zambia and ZimbabweForecast for peak demand for different sectors in Zambia(2020-2050)Current Power Deficit Zambia:900MW and Zimbabwe:600MW Zambia:Pe

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
1. **机构与背景**:赞比西河管理局(ZRA)由赞比亚和津巴布韦共建,负责卡里巴水坝运营及赞比西河新水电开发,潜在水电装机6,730MW,仅开发2,130MW。 2. **重点项目**: - **巴托卡峡谷水电项目(BGHES)**:装机2,400MW,投资42.54亿美元,股权回报率13-17%,预计创造2.69万个岗位,是南部非洲电力池(SAPP)关键枢纽。 - **魔鬼峡谷水电项目(DGHES)**:规划1,200MW,补充巴托卡项目。 - **卡里巴浮动光伏项目(FSPV)**:初期100-400MW,潜力扩至2,000MW,与水电协同增效。 3. **需求与市场**:两国电力缺口1,500MW(赞比亚900MW、津巴布韦600MW),2050年前需求将增长至超9,000MW新市场。 4. **投资亮点**:BGHES获联合国教科文组织《莫西奥图尼亚宣言》背书,强调可持续发展与区域合作。
**Batoka项目优势?** **Kariba太阳能潜力?** **ZRA如何推动能源合作?**
客服
商务合作
小程序
服务号
折叠