科贝格核电站安全长期运行验证路径——SALTO和PSR活动的协同效应.pdf

上传人: 可*** 编号:991499 2025-12-07 25页 4.67MB

1、Republic of South Africa:Eskoms Koeberg Nuclear Power PlantOperating Experience on the Integration of Periodic SafetyReview and Safety Aspects of Long-Term Operation(LTO)toproduce a safety case for LTOPresented by:Ms B MasheleJune 20242ESKOM,South AfricaBravance works within the Generation Division

2、at Eskom in the NuclearOperating Unit(NOU),focussed on long-term operation of the NPP.WithinNuclear Engineering her role is mainly concerned with safety assessmentsand analyses,plant life cycle management,and maintaining of design basisdocumentation(such as the safety analysis report),and long-term

3、planningfor sustainable operations.Before the current role,Bravance has been in various technical andmanagerial positions within the NOU,including systems engineering,workmanagement,and plant engineering.She is a professionally registered engineer with Engineering Council of SouthAfrica.Bravance has

4、 over 19 years of nuclear power plant design and operationsexperience.Koeberg Nuclear Power Plant Senior Manager:Koeberg NPP path to demonstrate safe LTO:Synergybetween SALTO and PSRActivities to Support Development of LTO safety CaseE-mail=mashelbreskom.co.zaPhone=+27(0)215505103Websites=https:/www

5、.eskom.co.zaShort BiographPurpose of the presentationThe overview will cover the generic lessons learned on the following:v Interactions with regulatory authorityv LTO programme and Organizational structurev LTO assessments Integration:PSR,SALTO and Site Characterization in Support of Safety Case.v

6、Recommendations.Aim:share the South African operating experience relating to the integration of SALTO and PSR activities in preparation for LTO and providing the safety case for LTONIC2024 Ageing Management and PSR Integration34Regulatory Framework:Interactions with the Regulatory AuthoritiesSouth A

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
根据《共和国南非:Eskom Koeberg核电站长期运行(LTO)的定期安全审查和安全方面整合经验》的内容,以下是全文关键点的概括: 1. **长期运行背景**:Koeberg核电站设计寿命为40年,初始许可证无到期日,2019年延长至2024年7月21日。 2. **监管要求**:需在许可证到期前42个月提交安全案例,满足合规性、安全分析、资源可用性等要求。 3. **安全案例**:包括场地特征、老化管理、全面评估等,需在许可证到期前24个月提交。 4. **监管互动**:与监管机构有多次公开会议,确保所有要求在提前达成一致,避免风险。 5. **LTO项目**:包括SALTO、PSR、场地特征等,涉及大量资源投入和技能要求。 6. **整合活动**:PSR、SALTO和场地特征活动需并行进行,确保一致性,避免返工。 7. **建议**:尽早开始LTO评估,确保技术人员的技能,明确标准,并提供充分文档以支持监管审查。
"南非核电站如何确保长期安全?" "Eskom的LTO项目有哪些经验教训?" "如何与监管机构有效互动?"
客服
商务合作
小程序
服务号
折叠