后续许可证续期——帕克斯核电站.pdf

上传人: 可*** 编号:991490 2025-12-07 23页 2.04MB

1、1NIC 2024,5-6 June 2024NIC Amsterdam 5-6 June,2024Subsequent License RenewalPaks NPP,HungaryStatus and challenges Sndor Rtkai,Head,Ageing Management SectionPl Weisz,Technical expert,SLR Project2NIC 2024,5-6 June 2024NIC Amsterdam 5-6 June,2024PAKS Nuclear Power PlantPublic owned Company,the only NPP

2、 in HungaryConnected to grid:1982-87,design life 30 yearsLicenced lifetime:2032-2037,(+20 years)Power uprated to 506-509 MW15 month fuel cycle,4.7%Uranium with GdNuclear34,55%Coal;7,08%Oil;0,09%Gas;19,01%Biogas;0,64%Biomass;3,02%Waste;0,69%PV;6,70%Wind;1,28%Hydro;0,37%Import;26,55%VVER-440/213 Russi

3、an Design PWRUnit 3506 WUnit 2506 WUnit 1509 WUnit 4506 W3NIC 2024,5-6 June 2024NIC Amsterdam 5-6 June,2024History of the SLR related activities4NIC 2024,5-6 June 2024NIC Amsterdam 5-6 June,2024LR(SLR)ProcessEnvironmental licenseUse of waterlicenseNuclear licenseProductionlicenseConsultation phaseIm

4、pact Assessment PhaseLicenseApplication forlicenseLicenseLTO(SLR)programmeImplementation ofLTO(SLR)programmeApplication forlicenseLicenseApplication forlicenseLicenseApproach is inspired by US NRC 10CFR54;10CFR50.65Difference:Environmental licencing belongs to different Authorities in Hungary5NIC 20

5、24,5-6 June 2024NIC Amsterdam 5-6 June,2024SLR Project organisation6NIC 2024,5-6 June 2024NIC Amsterdam 5-6 June,2024Local RegulationsSafety Guidelines1 2 3 4 5 6NuclearSafetyRegulationActNo.CXVI/.1996.on Atomic EnergyNuclear Licensing Legislation Guideline 1.28Regulatory procedures on the operation

6、 beyond the design lifetimeGuideline 4.14Activities to be implemented by the operator to support the License Renewal application for operation beyond design lifetimeAdoption for LR/SLR in NSR:10CFR5410CFR50.651/2022.HAEAdecreeLegally bindingNon-bindingOtherregulationsSLR requirements still not defin

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
根据报告的内容,全文主要内容概括如下: - **Paks核电站**:位于匈牙利,为该国唯一核电站,设计寿命30年,许可证有效期至2032-2037年,已升级至506-509 MW。 - **许可证延期(SLR)项目**:旨在确保核电站安全运行至设计寿命之外,采用美国NRC 10CFR54和10CFR50.65作为参考。 - **关键步骤**: - 提交SLR计划至HAEA。 - 提交SLR申请至HAEA。 - 进行综合工厂评估(IPA)和许可证延期申请报告(LRAR)。 - **老化管理**:包括老化管理审查(AMR)、时间有限老化分析(TLAAs)和老化管理计划(AMPs)。 - **挑战**:包括许可证获取难度、监管要求不明确、环境影响评估和公众听证会、资金问题、重建任务和潜在的停机时间增加。 - **未来计划**:SLR项目已启动,技术任务符合美国NRC标准,技术基础已建立,主要SLR项目任务已开始。
挑战与机遇" 安全升级之路" 许可证延期大揭秘"
客服
商务合作
小程序
服务号
折叠