1、Preparation of LTO of Atucha I NPPMarcelo Liendo Atucha Unit I NPPJune 5-6,2024Nuclear Innovation ConferenceAmsterdam,The NetherlandsEng.Marcelo Liendo metallurgical engineer graduated from the NationalTechnological University at Buenos Aires with more than 35 years ofexperience on metallurgy applie

2、d to the nuclear industry.Fellowship ofthe IAEA and the National Atomic Energy Commission of Argentina onMechanics of the Fracture applied on the integrity of pressurized nuclearcomponents,at University of Tennessee,USA.At the present,Chairman of the International Working Group in Argentinaof ASME(A

3、merican Society of Mechanical Engineers),Section III andmember of several organizations related to metallurgy and the nuclearindustry.Participation in the IAEA IGALL Working Group 1 and Host Plant Peer onthe SALTO missions at Atucha I(November 2021 and February 2024).At the present,Technical Advisor

4、 of the LTO Atucha I NPP.ContentsBackground of CNA Unit IStrategy of the LTO projectChallenges of the projectActionsConclusionsBackground of CNA Unit INuclear Power Stations in ArgentinaEmbalse1983(2019)PHWR AECL CANDU-6Electric Output:656 MWeAtucha I-1974-PHWR Siemens-Electric Output:362 MWeAtucha

5、II-2014-PHWR-KWU-Electric Output:745 MWeBackground of CNA Unit IMilestonesDesigner and constructorSiemens(Germany)First ConcreteJune 1968First CriticalityJanuary 13rd,1974FirstGrid ConnectionMarch 19th,1974Commercial OperationJune 24th,1974PowerThermal Power1.179 MWtGross Electrical Capacity357 MWeA

6、tucha I began its construction in June 1968 and became the first nuclear power plant in Latin America.Reactor Type:PHWRModerator/Coolant:Heavy WaterInlet Temperature to RPV:260COutlet Temperature to RPV:320CFuel:Natural Uranium(slightly enriched-0,85%U235)RPV Steel:DIN 22NiMoCr37(similar SA 508 Clas

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
根据报告的内容,全文主要内容概括如下: - **Atucha I NPP背景**:Atucha I核电站是拉丁美洲首个核电站,建于1968年,由Siemens设计建造,使用重水作为慢化剂和冷却剂。 - **LTO项目**:Atucha I的长期运行(LTO)项目于2009年被阿根廷国会宣布为国家利益项目,旨在延长其运行时间。 - **项目策略**:项目分为两个阶段,第一阶段(A阶段)于2018年开始,第二阶段(B阶段)预计于2024年9月启动。 - **挑战**:项目面临设计独特、信息更新不足等挑战。 - **行动**:包括重新构建设计基础、信息识别、软件安装、国际合作和设备更新等。 - **结论**:Atucha I NPP的LTO项目预计将持续至2046年,为国家电网提供362 MWe电力。
"核电站长寿秘诀?" "阿根廷核电站如何焕新?" "国际经验助力核安全?"
客服
商务合作
小程序
服务号
折叠