6392 - A journey to Open Rack V3.pdf

上传人: 芦苇 编号:651480 2025-05-01 11页 2.26MB

1、Hugo Collignon-HW ArchitectStphane Dutilleul-VP HW EngineeringA journey to Open Rack V3A journey to Open Rack V3Hugo Collignon-HW ArchitectStphane Dutilleul-VP HW EngineeringEMEA DEPLOYMENTSOF OCP RECOGNIZED SOLUTIONSWho is Scaleway?Our needs/objectivesA cloud provider thats 100%European A resilient

2、 product portfolio across 3 regions with multiple AZsA scaling,large and dense installed base to operateOptimizeCAPEX and OPEX better HW cost efficiencyrack level densitypower efficiencycooling efficiencyMany of the OCP projects with due considerationDC-MHS/DC-SCMSome Open FW solutions tooOpenBMCOpe

3、n Rack V3Open Rack V3 Optimized Power and cooling efficiencyOptimized Assembly and serviceabilityImproved Modularity&reusabilityPossible leadsLooking for:Specific socketMultinode can be nice2OU or moreCollaborate with a partner(specs to mass prod)=Our first ORV3 server wasnt existing off the shelfWh

4、en designing our own chassis:easier to do it on ORV3!Chassis/ServersHavent ORV3 switchesMotivation to use power from busbarDont want to add 2 PDU only for switch(es)How to connect them to tap-off(+WHIP cables to powershelf)Proper containment not so trivialSwitches-48 VDC is a telco standardDC PSU op

5、tion available for datacenter switchNo standard DC connectorCheck if PSU are fusedServiceability(PSU/fan swap,access to console)SwitchesFound blanking panels“racked”like servers with IT railsOr on another plan,not aligned with device facesIssue at OU1/OU44No vertical lock on the right planMagnets?No

6、t reliableEPDM?Only with the good one(thickness,adhesion,glue)=It works!Blanking panelsMultiple projects based on ORV3 in the pipeRack level test due in Q2 2025Go To Production expected in Q3/Q4 2025 Consider to make our contributions avail

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
本文主要介绍了Scaleway公司采用Open Rack V3(ORV3)标准,优化其硬件成本效率、机架密度、能效及冷却效率的历程。Scaleway寻求符合特定要求的硬件,如特定插槽、多节点服务器、2OU或更大的机架,并希望与合作伙伴共同开发从规格到大规模生产的硬件。公司面临设计挑战,如ORV3开关的缺失、电源总线供电的使用、PDU的添加,以及机架组件的准确安装。 文章中提到的关键数据包括: - ORV3服务器在多个项目中的应用。 - 预计Q2 2025进行机架级测试,Q3/Q4 2025开始批量生产。 此外,文章还强调了Scaleway对多样化的供应商、易于获取的零件(特别是原型制作),以及为小公司提供的分销服务的需求。公司还希望有更多的机架组件可用,并通过经验中心(https://eu.osfci.tech/)增强设施,以便进行硬件集成和更广泛的测试。Scaleway鼓励开发者参与,更多信息可在GitHub上找到(https://github.com/opencomputeproject/osf-osfci)。
如何优化电源和冷却效率?" Scaleway如何实现硬件成本效益优化?" Scaleway面临的设计挑战与解决方案是什么?"