1、ZESCO Solar PV ProjectsPresenter:Francis NamakandaDate:27November 2025Thisinformation hasbeen classified ZESCO ConfidentialExternal.Project Objectives/Benefits:Increased Electricity Generation and Availability:Reliable power supply forZambia.Economic Growth:Enhanced productivity for farming,fishing,
2、and localbusinesses.Access to Affordable Green Energy:Reduced reliance on biomass and dieselgenerators.Reduced Carbon Emissions:Contribution to climate change mitigation.Lower Energy Costs:Reduced cost of energy generation compared to fossil fuels.Alignment with SDGs:SDG 7:Affordable and Clean Energ
3、y SDG 12:Responsible Consumption and Production SDG 13:Climate Action1.1 ScopeThe scope of the phase II project involves the establishment of a 100MW solar plant adjacent to theexisting 100MW Chisamba Phase I Solar plant.The contract was fully executed on 2 September 2025.The Project cost is US$76.8
4、M1.2 Status of the ProjectSite cleared 100%,compaction and levelling at 100%progress.Equipment foundation civil works in progress.Detailed engineering design in progress1.4 Project SummaryCOD is July 20261.100MW Chisamba Phase II4100MW Chisamba Phase II-Control Room Foundations2.1 ScopeThe project i
5、nvolves establishment of 100MWac solar plant Chipata nearest to Chipata West 330/132/33kV Substation.COD is June 2026.2.2 Status of the ProjectContract fully signedSite handover done on 19 September 2025.Site Clearing commenced and at 50%progress.Detailed engineering design in progress2.3 Project Su
6、mmaryCOD is expected to be June 20262.100MW Chipata West6100MW Chipata West-Site Clearing and leveling3.1 ScopeThe project involves establishment of 50MWac solar plant in Mansa District of Luapula Province.The project isexpected to cost US$48M.The Project is being developed by ZESCO Limited.3.2 Stat