1、Next Phase of Energy Storage Deployment Dr.William Acker,Executive Director Thursday,March 12,20261Electricity Grid UtilizationNYCA Load 2025Load MWHours%of Year31,000 50.05730,000 200.22829,000 390.44528,000 720.82227,000 1331.51826,000 2012.29525,000 2813.208Load GrowthSource:NYISO 2025 Load and C

2、apacity Data Gold BookNeed to build capacitySource:NYISO Electricity Prices in New York,January 2026“Of 106 projects that have completed the NYISOs interconnection process since 2019,the NYISO estimates that just seven,representing 3,493 MW,have begun construction.”Projects that have completed NYISO

3、s Interconnection Process since 2019Distributed assets Present rules have launched the industryTo scale to the levels we need,we will need to address Interconnection Permitting and Moratoria Control and Compensation to unlock flexibilityTwo approaches to interconnectionHardening v.ControlChallenges

4、with HardeningHardening generally results in over building Asset can operate backwards compared to desired state Artificially reduces hosting capacity Un-productive upgrades to deal with unrealistic harmful behavior Mitigation strategies of using time window and forcing static behavior of flexible a

5、ssetsIt is a particular problem for flexible,bi-directional assetsFlexible InterconnectionFully flexible interconnection requires sophisticated sensing and control on the utility systemThere are a number of intermediate levels that unlock substantial hosting capacity and avoid major grid upgradesMod

6、ify for contingency operation(e.g.transformer goes down)Quasi-static windows to avoid un-productive behavior(modify based on advance schedules like reducing output during light load seasons)DR style calls to modify behavior(e.g.curtail charging based on day-ahead signal)Expanded auto-DLM calls(e.g.m

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
1. **电网负荷与增长**:纽约2025年负荷峰值31,000MW,需新增容量;2019年以来106个项目中仅7个(3,493MW)并网。 2. **三大挑战**:并网(需灵活替代传统加固)、审批与禁令(需社区信任建设)、控制与补偿(VDER需适应灵活资产)。 3. **安全与信任**:纽约州2025年消防法规严格(UL9540/9540A、NFPA 855),通过官员巡访、环保合作(如Solar One workshop)建立信任。 4. **补偿机制**:静态时间窗口需动态调整(如“Kitten Curve”),BTM资产补偿复杂(尤其住宅侧)。 5. **未来规划**:Grid of the Future计划(2026年夏发布)指导灵活资源整合。
**储能困境?** (针对电网互联和许可挑战,吸引关注能源行业政策制定者) **安全隐忧?** (聚焦储能系统安全与社区信任,吸引地方政府和环保组织) **灵活补偿?** (探讨VDER机制对双向资产的适应性,吸引技术开发商和投资者)