当前位置:首页 > 报告详情

推进门禁经济:探索 EcoGate一种使多个 GSE 单元协同工作的设计方法.pdf

上传人: 拾亿 编号:1171029 2026-03-21 9页 2.30MB

1、IntroducingEcoGateA visionary approachto advancinggate economicsIts all about connectionsLars Vestergaard,Sales Director Europe3500PCA 3500Air Coil CommonDesignPlatformPowerShareDCCharger2400PowerCoil Automated Aircraft Type DetectionIntelligent Power ManagementUpgrade and expand your gate capabilit

2、ies without having to invest in additional power infrastructure7400eGPUPowerInputVDGS/BMSLandingpageITW GSE 3500PCAITW GSE 2400Cable RetrieverITW GSE 2400Power CoilITW GSE 2400CompactITW GSE 3500Air CoilITW GSEPower ShareEcoGate enabled productsEcoGate enabled product overviewITW GSEDC ChargerLoad s

3、haring for 400 Hz and PCA during turnaroundExample of Code C Aircraft050100150200250300Input current50 minute turnaroundEx.:GSE power consumption for C gate during hot seasonIPM ActivePCA(Priority 2)TotalGPU(Priority 1)Maximum limitThe PCAs smoothly adjusts its own consumption during 400 Hz peakGPUS

4、pare capacity allows you to.add a PCAor a hose retriever,a cable retriever or Traditional GateEcoGateCode C AircraftPre-fusingTypicalAverage LoadActual/Typical Current draw 400 V(Input)GPU(90 kVA)200 A30 A PCA 150225 A150 ATotal425 A180 AExcessCapacity245 APower your eGSE efficiently with a Power Sh

5、areCharge your eGPU or other AC units with excess power from your 2400 GPU,2400 Power Coil or 3500 PCA without having to upgrade gateinfrastructurePower your eGSE efficiently with a DC ChargerSmarter energy use,lower costsEfficient load sharing for maximum power utilization and dynamic distribution

6、of available powerFast,high-speed chargingUse existing infrastructure and surplus power to charge your eGSE with 60 kWFlexible installationTake advantage of opportunity charging closer to operations at the gate or parking standSmart DC Char

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
客服
商务合作
小程序
服务号
折叠