1、Ageing management from commissioning to subsequent LTO periodsKari MkelOperational Safety SectionDivision of Nuclear Installation SafetyIAEANuclear Innovation Conference(NIC)2024Personal introductionName:Kari MkelPosition in IAEA Senior Nuclear Safety OfficerOperational Safety SectionDivision of Nuc

2、lear Installation SafetyCurrent Main Activities in IAEAMember of PI team currentlyWorked in LMS<O teamsDone SALTO&OSART missions as DTL and reviewerSince February 2015 with IAEAPrior IAEA:worked in VTT,Fortum Loviisa NPP,STUKChallenges for ageing management and safe long term operationSafety aspec

3、tsLack of legislation®ulatory requirements/guidance for ageing management and LTO preparation and implementation.Issues with design information.Plant programmes and databases.Human resource challenges:knowledge and competence management.Required safety improvements.Other aspectsPublic acceptance.

4、Political commitment.Economic feasibility(including safety improvements).Recommendations in Safety Guide SSG-48 are applicable for NPPs throughout their entire lifetime050100150200250300350200220032004200520062007200820092010201120122013201420152016201720182019202020212022Energy Loss in GW(e).h Equi

5、pment problem/failureTesting(systems/components)Regulatory requirementsGrid limitation/failure/unavailabilityLoad-followingHuman factor relatedEnvironmental conditionsFireExternal restrictionsFuel limitationOthersLineair(Equipment problem/failure)Energy Losses due to scrams(causes)%of IRS reports(10

6、1 reports)related to ageing management,all NPPs05101520253035402011201220132014201520162017201820192020202120222023SALTO=Safety Aspects of Long Time Operation.An IAEA peer review service to support Member States in developingageing management and prepare for LTO.Described in IAEA Service Series 26(R

友情提示

1、下载报告失败解决办法
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站报告下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

本文(从项目启动到后续长期运营期间的老化管理.pdf)为本站 (可不可以) 主动上传,三个皮匠报告文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三个皮匠报告文库(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。
客服
商务合作
小程序
服务号
折叠