1、Construction Reconciliation ProcessKayla DuBoisManager Work&Vegetation ManagementMarch 12,2026Distribution-Construction Work Order FlowConstruction Complete Crew completes as-built Work order paper packet is mailed to Engineering FilesWork Order Scanned Work order received in Engineering Files from

2、field and is manually scanned Electronic work order is then sent to GIS for critical map updatesMaterial Reconciliation Paper work order packet is mailed back to the district for the material reconciliation to be completedCost Reconciliation Paper work order packet is sent to the Work Management tea

3、m for cost reconciliation and final PowerClerkupdates1-2 weeks1 week1-2 weeks1 weekCost ReconciliationActual costs comprised of internal Central Hudson labor compiledMeterActual costs comprised of internal Central Hudson labor+material+contractor labor compiledDifferences between original cost estim

4、ate and actual charges analyzed to ensure all necessary work completed DistributionActual costs comprised of internal Central Hudson labor+material+contractor labor compiledDifferences between original cost estimate and actual charges analyzed to ensure all necessary work completed SubstationThe Meter,Distribution,and Substation work orders are reconciled using the developer payment held in a collect cost work orderCustomer refund or additional payment required is communicated to Central Hudsons solar teamCollect Cost

友情提示

1、下载报告失败解决办法
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站报告下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

本文(施工协调流程.pdf)为本站 (颜如玉) 主动上传,三个皮匠报告文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三个皮匠报告文库(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。
客服
商务合作
小程序
服务号
折叠