《嘉能可(GLENCORE)2024年第一季度财报(英文版)(16页).pdf》由会员分享,可在线阅读,更多相关《嘉能可(GLENCORE)2024年第一季度财报(英文版)(16页).pdf(16页珍藏版)》请在三个皮匠报告上搜索。
1、 Glencore Q1 2024 Production Report 1 NEWS RELEASE Baar,30 April 2024 First Quarter Production Report 2024 Glencore Chief Executive Officer,Gary Nagle:“Our full year production guidance remains unchanged from that presented at the beginning of the year.First quarter copper,zinc and coal production w
2、as broadly in line with the prior year comparable period,while nickel increased 14%,reflecting recovery from the Raglan strike impacts in the base period.Lower year-on-year cobalt and ferrochrome volumes primarily reflect the previously announced market-related production adjustments in the DRC and
3、the decision to idle our Rustenburg ferrochrome smelter in the current price environment.“Basis Marketings performance over the first quarter,we currently expect full year Marketing Adjusted EBIT in the$3.0-$3.5 billion range,being around the top end of our long-term$2.2-3.2 billion p.a.guidance ran
4、ge,reflecting cyclically elevated interest rates.”Production from own sources Total1 Q1 2024 Q1 2023 Change%Copper kt 239.7 244.1 (2)Cobalt kt 6.6 10.5 (37)Zinc kt 205.6 205.3 Lead kt 43.8 39.3 11 Nickel kt 23.8 20.9 14 Gold koz 201 187 7 Silver koz 4,520 4,525 Ferrochrome kt 297 400 (26)Coal mt 26.
5、6 26.9 (1)1.Controlled industrial assets and joint ventures only(excludes Volcan).Production is on a 100%basis,except as stated later in this report.Q1 production highlights Own sourced copper production of 239,700 tonnes was 2%above Q1 2023 on a like-for-like basis,removing 8,700 tonnes of Cobar(so
6、ld in June 2023)volumes from the prior period.Own sourced cobalt production of 6,600 tonnes was 3,900 tonnes lower than Q1 2023,mainly reflecting planned lower run-rates at Mutanda in the current weak cobalt pricing environment and mill downtime at KCC.Own sourced overall zinc production of 205,600