当前位置:首页 >英文主页 >中英对照 > 中译版报告详情

RBC:2023电动汽车充电基础设施战略报告(中译版)(71页).pdf

上传人: Kell****reet 编号:131281 2023-07-03 71页 2.18MB

下载:

1、 Reading Transport Strategy 2040 Sub-Strategy:Electric Vehicle Charging Infrastructure Strategy 2023 Draft for Consultation-June 2023 Electric Vehicle Charging Infrastructure Strategy 2023 Page i June 2023 CONTENTS PAGE FOREWORD ii 1.INTRODUCTION 1 2.POLICY CONTEXT 7 3.EV CHARGING INFRASTRUCTURE IN

2、READING 15 4.CHARGING INFRASTRUCTURE OPTIONS APPRAISAL 37 5.FUNDING OPTIONS AND OPPORTUNITIES 49 6.CONCLUSION 58 7.CHARGING INFRASTRUCTURE DELIVERY PLAN 60 This document is available in accessible formats on request by email to transportreading.gov.uk June 2023 Page ii Electric Vehicle Charging Infr

3、astructure Strategy 2023 FOREWORD Our new draft Electric Vehicle Our new draft Electric Vehicle(EV)(EV)Charging Infrastructure Strategy has been developed as a subCharging Infrastructure Strategy has been developed as a sub-strategy strategy to the to the emergingemerging Reading Transport Strategy

4、2040Reading Transport Strategy 2040,which aims to deliver a sustainable transport system in,which aims to deliver a sustainable transport system in Reading to create an attractive,green and vibrant town.This Reading to create an attractive,green and vibrant town.This EV EV Strategy is also an import

5、ant Strategy is also an important elementelement in in achieving the aims and objectives of Readings Climate Emergency Strategy,including the ambachieving the aims and objectives of Readings Climate Emergency Strategy,including the ambitious itious target of achieving a net zero carbon town by 2030.

6、target of achieving a net zero carbon town by 2030.Central Government has brought forward plans to ban the sale of new petrol and diesel cars in the UK by 2030,and over the past few years there has been a significant growth in the proportion of new EV sales across the country,including in Reading.Th

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
根据《Reading Transport Strategy 2040 Sub-Strategy: Electric Vehicle Charging Infrastructure Strategy 2023 Draft for Consultation》的内容,本文主要概括了Reading市电动汽车充电基础设施策略的制定过程和目标。 1. Reading市政府正在制定一项电动汽车充电基础设施策略,以支持Reading Transport Strategy 2040和Reading气候紧急策略,旨在通过减少碳排放和改善空气质量来创造一个绿色、有活力的城镇。 2. 该策略的目标包括:发展Reading范围内的电动汽车和零排放车辆(包括电动公交车、汽车俱乐部、出租车、电动自行车和电动滑板车)的使用;增加公共电动汽车充电点的供应,以适应电动汽车的增长;提供社会公平和无障碍的充电点;提供可靠的充电基础设施;考虑其他道路使用者的需求;与公交车运营商、汽车俱乐部和出租车司机合作,提供鼓励向电动化转变的基础设施;寻求为电动自行车和电动滑板车(取决于立法)提供充电基础设施;确保市政府通过采用电动汽车技术并继续将车队适应为电动汽车/超低排放车辆来发挥领导作用;寻求在2030年前为市政府土地或公路上的充电点提供可再生能源。 3. 该策略将涵盖电动汽车充电基础设施的各个方面,包括电动汽车市场和基础设施的当前和新兴市场、电动汽车和基础设施的当前和未来需求、基础设施选项的评估、投资/资金机会、外部合作伙伴关系以及市政府自己的车队需求等。 4. 该策略将需要大量的资源和资金,无论是来自公共资金还是私人部门资金,或者两者结合。市政府需要定义其在电动汽车充电基础设施交付中的角色,并与利益相关者和供应商合作,为Reading提供电动汽车充电网络。
电动汽车充电基础设施策略的目标是什么? 电动汽车充电基础设施策略将如何影响Reading的空气质量? 电动汽车充电基础设施策略将如何帮助Reading实现2030年碳中和目标?
客服
商务合作
小程序
服务号
折叠